Accenture Cobalt, Newcastle

 

This project involved the re-modelling of existing IT Room and Meeting Room over two levels at Cobalt 15A. The works included: 

     ·        Stripping out existing glazed partitions
·        Stripping out existing ceiling mounted M&E and ceiling grids as required
·        Stripping out ceiling form new bulkhead
·        Stripping out flooring
·        Stripping out partitions
·        Carry out alterations to M&E Services to suit new room layout and bulkhead
·        Alterations to new openings for glazed partitions and forming new bulkhead
·        Installation of ceilings for new M&E fittings
·        Decoration works
·        Installation of new glazed screens with doors
·        Laying new flooring