Costa Coffee, Meteor Centre, Derby

 

This project involved the construction of a Costa Coffee Drive Thru on the retail park. The works included:
·        Diversion of existing street lighting cable and surface water drainage
·        Bulk excavation & reduce level dig
·        Excavation of pad and strip foundations
·        Underslab & perimeter drainage
·        Erection of structural steel frame
·        Installation of build-up roof structure & guttering
·        Installation of Mansafe system
·        Installation of verges, edges & trims, rainwater goods and fascia’s & soffits
·        Construction of floor slab
·        Construction of double skin blockwork wall & external facing brickwork
·        Installation of external shopfront system and doors
·        Installation of windows
·        Application of render system to blockwork
·        Installation of horizontal timber cladding system
·        Installation of two louvres
·        Installation of new roller shutter door
·        Installation of external envelope signage
·        Laying internal floor screeds
·        Plasterboard to internal reveals and column linings etc.
·        Installation of incoming services
·        Construction of bin store
·        Creating a new car park including kerbs and edgings
·        Installation of entrance height barrier
·        Landscaping and fencing to perimeters of site