McDonalds Bradford, Forster Square

 

This project involved the refurbishment of an existing McDonalds Restaurant to a new livery and design – Restaurant of the Future. In order to keep disruption to a minimum, the restaurant was closed down and a programme of 24/7 continuous working carried out over four weeks. The works included: 

  • Amendments to existing roof line including new folding roof and installation of new roof signage

  • Installation of new glazing

  • Removal of existing & installation of new Café fixtures and fittings

  • Removal of existing & installation of new ceiling grids

  • Reconfiguration of existing & installation of new electrical, mechanical & data
    cabling services as required.

  • Fit new sliding doors and frames

  • Removal of existing & installation of new floor coverings

  • Decoration of all areas within the unit to suit new layout

  • Removal of existing & installation of new internal signs.

  • Heating, plumbing, plastering & joinery works as required to suit new layout.

  • Amendments to fire/smoke alarms & emergency lighting to suit new layout.

  • Installation of CCTV

  • Installation of new freezer/chiller

  • New fixtures and fittings within the kitchen.

  • Reconfiguration of Café seating areas.

  • Groundworks/surfacing works to improve existing Drive Thru lane

  • Installation of new glazed patio barriers and lighting posts

  • Blockpaving to the perimeter and patio, fit new furniture, fit new close boarded fence