McDonalds Doncaster, Lakeside Village

 

This project involved the refurbishment of an existing McDonalds Restaurant to a new livery and design – Restaurant of the Future. In order to keep disruption to a minimum, the restaurant was closed down and a programme of 24/7 continuous working carried out over seven weeks. The works included: 

  • Refurbishment of existing toilets

  • Relocation of Manager’s Office

  • Electrical/Mechanical/Data cabling works as required when forming the new layout

  • Partial Demolition and reconfiguration to all elevations.

  • Extension and modification of the freezer/chiller

  • Roof maintenance

  • Fitting new suspended ceiling

  • Reconfiguration of restaurant seating areas.

  • Decoration

  • New graphics to the restaurant area

  • Installation of new kitchen equipment

  • Replacement of restaurant fixtures and fittings

  • Replacement of floor coverings with new

  • Installation of a new counter and digital menu boards

  • Removal of existing & installation of new internal signs.

  • Removal of existing and replacement with new fire / smoke alarms & emergency lighting to suit new layout.

  • Groundworks and resurfacing of the Drive Thru lane.

  • Landscaping works to external areas.

  • Drainage works to suit the new external layout.