McDonalds, Sunderland Retail Park

 

This project involved the refurbishment of an existing McDonalds Restaurant to a new livery and design – Restaurant of the Future. In order to keep disruption to a minimum, the restaurant was closed down and a programme of 24/7 continuous working carried out over four weeks. The works included:

  • Demolitions to form new openings for extensions.
  • New small booth extension
  • New freezer extension
  • Refurbishment works to existing toilets
  • Electrical/Mechanical/Data cabling works as required when forming the new layout
  • Construction of new McCafe wall
  • Installation of new kitchen equipment
  • New wall and floor tiling
  • Laying of new Amtico flooring
  • New graphics to the restaurant area
  • Replacement of restaurant fixtures and fittings
  • Removal of existing, & installation of new, ceiling grids
  • Decoration of new restaurant
  • Installation of a new counter and digital menu boards
  • Removal of existing & installation of new internal signs.
  • Reconfiguration of existing fire/smoke alarms & emergency lighting to fit new layout
  • Installation of CCTV
  • Installation of new Side by Side lane and bollards
  • New glazed shop fronts
  • Fit new paving slabs and tactile paviours to signage areas
  • Installation of new external signage
  • Hard and soft landscaping