Burton Shopping Centre

 

Key Property Solutions were appointed Principle Contractor to undertake the installation of new store frontages, sub-division of the unit and installation of new cladding to the former BHS store. The fitout of the store and external signage erection was undertaken by the incoming tenant. The works included:

  • Demolition and strip out to existing BHS unit

  • Internal demolition of ex unit 23-25

  • Demolition of internal division wall to unit 21

  • Demolition of existing canopy

  • Removal of existing tiled facades

  • Demolition of external skin of brickwork to high level

  • Removal of existing shopfronts and doors

  • Installation of new structural steelwork

  • Installation of framework for Wetherby render panels

  • Installation of Wetherby render panels

  • Render finishes to panels

  • Installation of single glazed frameless glazing

  • Internal drainage works

  • Construction of internal Jumbo stud partition division

  • Installation of new services

  • Removal of existing louvres and doors

  • Forming structural openings for new doors

  • Construction of new brickwork panels

  • Installation of new external doors and windows

  • Formation of new plant enclosure with mesh panelling

  • Installation of rainscreen cladding, including frame, to existing stair tower

  • Installation of new ram-raid bollards to external pedestrian paving adjacent to the existing car park