Unit 2, Meteor Centre, Derby

 

This project involved the construction of new front and rear extensions, refurbishment and sub division works to an existing retail unit on the retail park, to bring it up to a lettable standard. The works included:

     ·        Disconnection of existing services
·        Removal of existing canopy and cladding to front and rear elevation
·        Removal of existing roof cladding & insulation and replacement with new
·        Removal of existing service bay to rear
·        Strip out existing internal FF&E and floor finishes
·        Demolition of internal walls & partitions
·        New pad foundation for mezzanine columns
·        Construction of concrete slab for front and rear extensions
·        Under slab drainage
·        Erection of new structural steel frame for extensions and joining with the existing             frame
·        New guttering & rainwater goods
·        Installation of man-safe systems
·        Cladding to frontages and rear elevations
·        Installation of new glazed shopfronts
·        Installation of three double door sets to rear elevation
·        Full height internal blockwork wall to rear extension
·        Construction of shaft wall construction against existing units and metal stud partition
·        Plastering and decoration of new stud walling
·        Signage to units
·        External drainage in rear yard
·        New kerbs to frontage
·        Installation of new bollards to front
·        New paving to the front of the unit
·        New hardstanding to rear
·        Resurface/make good service yard