top of page

STARBUCKS, DUNDEE

A new Starbucks drive-thru outlet and associated external works

This project involved the construction of a new Starbucks Drive Thru shell and external works. Works included:

  • New foundations

  • Installation of underslab and perimeter drainage

  • Erect structural steel frame

  • Installation of concrete column surrounds to structural steelwork

  • Installation of composite roof decking

  • Create ground floor slab

  • Construct Metsec frame to perimeter wall

  • Installation of cladding to elevations

  • Installation of curtain walling

  • Installation of external doors and windows

  • Installation of rainwater goods

  • Install new surface water drainage, manholes and inspection chambers

  • Install external foul water drainage and connect to existing

  • Create plant and refuse area and surround with      perimeter fence

  • Create paved walk ways

  • Create car park and Drive Thru

  • Install and connect external lighting columns

  • White line car park

  • Undertake improvements to existing service road

  • Installation of street furniture, cycle hoops and signage

  • Landscaping works

bottom of page